Attempts by untrained operators (N = 32) | Average ± SD | Min | Max | Median | 25th percentile | 75th percentile | p value |
---|---|---|---|---|---|---|---|
Attempts with the standard method (N) | 1.87 ± 1.53 | 1 | 7 | 1 | 1 | 2 | p < 0.050 |
Attempts with the tTNI (N) | 1.28 ± 0.5 | 1 | 3 | 1 | 1 | 1 | |
Time required for standard method (s) | 46.8 ± 65.73 | 6 | 300 | 22.5 | 17 | 36.25 | p < 0.001 |
Time required for tTNI (s) | 17.21 ± 19.7 | 4 | 92 | 10 | 7.75 | 15.25 | |
Precision of the first attempt* with standard method | 22.03 ± 30.47 | 0 | 120 | 15 | 0 | 30 | p < 0.020 |
Precision of the first attempt* with the tTNI | 5.16 ± 12.98 | 0 | 60 | 0 | 0 | 0 |